Cathedral of the Holy Cross
Location:
1400 Washington Street Boston, MA
General Contractor:
Suffolk Construction
Owner:
Archdiocese of Boston
Size:
70,000 sq/ft.
Project Scope
The project scope entailed the highly-detailed retrofit/installation of the Cathedral’s lighting to LED light fixtures and lighting controls system. In addition to the scope, we installed a security system consisting of access control and video monitoring and the A/V system for Catholic TV. A field crew of eight journeyman electricians plus four telecom technicians were a part of this historic renovation of the largest church in New England.
Special Challenges
This project consisted of our crew working around very highly detailed historically sensitive artifacts within the church at heights up to 120 feet.